Banco Santander S.A. (2021)

Signing Date 30 Apr 2009
Region of Headquarters: Europe
Current EPFI Reporting Year/Period: 2021
Institutional Reporting: Link to Report

 

Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the EP website.

Further information on this EPFI may be obtained through the Institutional Reporting hyperlink.

Project Finance Advisory Services

Total number mandated in the reporting period: 0

Project Finance Transactions

Total number that reached Financial Close in the reporting period: 63

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure 3 3
Oil & Gas 2 1
Power 1 51 2
Others
Region
Americas 23 1
Europe, Middle East & Africa 1 33 5
Asia Pacific
Country Designation
Designated Country 4 1 52 5
Non Designated Country 4 1
Both
Independent Review
Yes 1 55 3
No 1 3
Totals 1 56 6
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project Finance

This information is required under EP4. EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Project Name Reporting For Project Finance (And Project-related Refinance & Project-related Acquisition Finance For Project Finance)

No. Project Name Sector Project Location(s) Year of Financial Close
1 MERO 2 OWNING Oil & Gas Brazil 2021
2 Via 40 Infrastructure Colombia 2021
3 Río Magdalena 2 Infrastructure Colombia 2021
4 Pedemontana Junior Infrastructure Italy 2021
5 STR Barranquilla - Energía de Colombia Power Colombia 2021
6 Matrix 80.7MWp Solar PV Power Chile 2021
7 Project PGL Power France 2021
8 Project Darwin Power Germany 2021
9 Project Alpino Power Italy 2021
10 Red Giant Solar Power Plant Power Italy 2021
11 Puerto Libertad Solar Power Plant Power Mexico 2021
12 Generg Overpowering Project Power Portugal 2021
13 Hathi 100MW CSP Solar Plant Power Spain 2021
14 Project Derramador 50MW Wind Farm Power Spain 2021
15 Project Frontones 50MW Wind Farm Power Spain 2021
16 Project Fuente Alamo 50MW Wind Farm Power Spain 2021
17 Borges 25MW CSP and Biomass Hybrid Plant Power Spain 2021
18 Q-Energy Termollano 50MW CSP Power Spain 2021
19 Extresol 3 Solar Power Plant Power Spain 2021
20 Serrezuela 2 Solar Power Plant Power Spain 2021
21 La Africana Project Power Spain 2021
22 Project Ares Solar Power Plant Power Spain 2021
23 Project Bosque Wind Power Power Spain 2021
24 Vendimia & Barrica PV Solar Project Power Spain 2021
25 Cuevas Wind Farm Power Spain 2021
26 Archimedes 120MW PV Plant Power Spain 2021
27 Sevilla Onshore Spanish Wind Farms Power Spain 2021
28 Berfest Solar PV Power Spain 2021
29 Bulería (Q-ENERGY RAYO S.L.) Power Spain 2021
30 Sancho Others Spain 2021
31 Renovalia PV Brownfield (SIX) Power Spain 2021
32 Extresol 1 Power Spain 2021
33 Extresol 2 Power Spain 2021
34 Manchasol 1 Power Spain 2021
35 Olivares Power Spain 2021

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 28

Under EP4, project name reporting is required for Project Finance transactions that have reached Financial Close and encouraged for Project-Related Corporate Loans that have reached Financial Close.

Project-Related Corporate Loans

Total number that reached Financial Close in the reporting period: 0

Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans

This information is required under EP4. EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Implementation of the Equator Principles