Sumitomo Mitsui Banking Corporation (2021)

Signing Date 23 Jan 2006
Region of Headquarters: Asia-Oceania
Current EPFI Reporting Year/Period: 2021
Institutional Reporting: Link to Report

 

Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the EP website.

Further information on this EPFI may be obtained through the Institutional Reporting hyperlink.

Project Finance Advisory Services

Total number mandated in the reporting period: 24

Sector
Mining
Infrastructure 6
Oil & Gas 4
Power 14
Others
Sub-Total 24
Region
Americas 3
Europe, Middle East & Africa 16
Asia Pacific 5
Sub-Total 24

Project Finance Transactions

Total number that reached Financial Close in the reporting period: 79

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure 1 5 6
Oil & Gas 1 6
Power 5 38
Others 1 16
Region
Americas 28 4
Europe, Middle East & Africa 2 8 9
Asia Pacific 5 14 9
Country Designation
Designated Country 4 1 37 19
Non Designated Country 6 13 3
Both
Independent Review
Yes 7 48 13
No 2 9
Totals 7 50 22
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project Finance

This information is required under EP4. EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Project Name Reporting For Project Finance (And Project-related Refinance & Project-related Acquisition Finance For Project Finance)

No. Project Name Sector Project Location(s) Year of Financial Close
1 Dohoku Onshore Wind Project Power Japan 2021
2 Mozambique Area 1 Oil & Gas Mozambique 2021
3 Corner Brook Acute Care Hospital Infrastructure Canada 2021
4 Dammam ISTP Infrastructure Saudi Arabia 2021
5 Project Rhapsody Infrastructure Australia 2021
6 JERA - Reliance Meghnaghat 718MW Power Bangladesh 2021
7 Project Mercury Offshore Wind Farm Power Taiwan, China 2021
8 Bighorn Solar Power United States 2021
9 D4 Highway PPP Project Infrastructure Czechia 2021
10 ICN10 - Korean Data Center Others Korea, Rep. 2021
11 Western Downs Solar Farm Power Australia 2021
12 Jazan IGPF Power Saudi Arabia 2021
13 Project Poppy Others Poland 2021
14 Data4 Others France 2021
15 Project Shiro Others Japan 2021
16 EDEN SECI III 3000MW India Solar Project Power India 2021
17 Dubai Waste to Energy Power United Arab Emirates 2021
18 Goi Power Project Power Japan 2021
19 PV2 Solar Power United Arab Emirates 2021
20 La Pimienta Solar Project Power Mexico 2021
21 Lincoln Land Wind ( " Lincoln Land " ) Power United States 2021
22 Minami Aoyama Senior Residence PJ Others Japan 2021
23 PDCG ( Group Services ) Limited Others United Kingdom 2021
24 Project Wisteria Others Netherlands 2021
25 Advance Tunnel for the Scarborough Subway Extension Project Infrastructure Canada 2021
26 Advance Tunnel for Eglinton Crosstown West Extension P3 Infrastructure Canada 2021
27 Unsere Güne GmbH & Co KG ( Project Beetohven) Infrastructure Germany 2021
28 Athos I & Athos II Power United States 2021
29 Meseta Project / Sonnedix Power Chile 2021
30 Stellar 1 Vantage Data Center Project Others Germany 2021
31 North East Link PPP Infrastructure Australia 2021
32 Project Pisa Power Australia 2021
33 DESRI Utah Solar Power United States 2021
34 Sumita Tono Wind Farm Power Japan 2021
35 Cirata Floating PV Power Project Power Indonesia 2021
36 Project Jolene Infrastructure Netherlands 2021
37 DESRI River Fork Power United States 2021
38 Enfragen PMGD Power Chile 2021
39 Cabo Leones III Power Chile 2021
40 KARATSU BIOMASS ENERGY LLC Power Japan 2021
41 GM Holdings S.A. Power Chile 2021
42 Pure Data Centre, Jakarta, Indonesia Others Indonesia 2021
43 SAKAIDE BIOMASS POWER LLC Power Japan 2021
44 Project Eden ( Adamo Telecom ) Infrastructure Spain 2021
45 Arroyo Solar and Energy Storage Power United States 2021
46 Project Campanario Power Spain 2021
47 Project Penfold Oil & Gas Australia 2021
48 Generadora de Gatun S.A. Power Panama 2021
49 ODATA SP01/2/3 Others Brazil 2021
50 Daggett 3 Solar Power United States 2021
51 DESRI Highland Power United States 2021
52 Project SWIFT Infrastructure India 2021
53 SAMTY / Six Senses Kyoto Dev PJ Others Japan 2021
54 Termoelectrica El Tesorito S.A. Power Colombia 2021
55 Blue Grass Solar Farm Power Australia 2021
56 Project Mandalorian Others Hong Kong SAR, China 2021
57 AES Warehouse Facility Power United States 2021

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 22

Under EP4, project name reporting is required for Project Finance transactions that have reached Financial Close and encouraged for Project-Related Corporate Loans that have reached Financial Close.

Project-Related Corporate Loans

Total number that reached Financial Close in the reporting period: 8

Equator Principles Category A1 B2 C3
Sector
Mining 1
Infrastructure 3
Oil & Gas 2
Power
Others 2
Region
Americas 2 1
Europe, Middle East & Africa
Asia Pacific 2 3
Country Designation
Designated Country 4 1 2
Non Designated Country 3 2
Both
Independent Review
Yes 4 1
No 3
Totals 4 4
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans

This information is required under EP4. EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Project Name Reporting For Project-related Corporate Loans (And Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans)

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 8

Under EP4, project name reporting is encouraged for Project-Related Corporate Loans that have reached Financial Close and required for Project Finance transactions that have reached Financial Close.

EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Implementation of the Equator Principles