Sumitomo Mitsui Trust Bank, Limited (1 Jan 2026 – 31 Mar 2026)

Signing Date 01 Feb 2016
Region of Headquarters: Asia-Oceania
Current EPFI Reporting Year/Period: 1 Jan 2026 - 31 Mar 2026
Institutional Reporting: Link to Report

 

Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the EP website.

Further information on this EPFI may be obtained through the Institutional Reporting hyperlink.

Project Finance Advisory Services

Total number mandated in the reporting period: 0

Project Finance Transactions

Total number that reached Financial Close in the reporting period: 13

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure
Oil & Gas
Power 1 5
Others 7
Region
Americas 2 1
Europe, Middle East & Africa 1
Asia Pacific 3 6
Country Designation
Designated Country 4 5 7
Non Designated Country 1
Both
Independent Review
Yes 1 5 5
No 2
Totals 1 5 7
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project Finance

Total number that reached Financial Close in the reporting period: 0

Project Name Reporting For Project Finance (And Project-related Refinance & Project-related Acquisition Finance For Project Finance)

No. Project Name Sector Project Location(s) Year of Financial Close
1 Ibaraki-Hanawa wind farm Power Japan 2026
2 Facility E Water and Power Project Power Qatar 2026
3 Sanmori Tōge Wind Farm Project Power Japan 2026
4 Project Granite Power United States 2026
5 Project Longhorn Others United States 2026
6 Yellow Wood Solar Power United States 2026
7 Inaniwa Takko Wind Farm Power Japan 2026
8 Ichinomiya Battery Energy Storage System Project Others Japan 2026
9 ENIWA BATTERY ENERGY STORAGE SYSTEM PROJECT Others Japan 2026
10 IGA BATTERY ENERGY STORAGE SYSTEM PROJECT Others Japan 2026
11 MATSUSAKA BATTERY ENERGY STORAGE SYSTEM PROJECT Others Japan 2026
12 ISHIYAMA BATTERY ENERGY STORAGE SYSTEM PROJECT Others Japan 2026

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 1

Under EP4, project name reporting is required for Project Finance transactions that have reached Financial Close and encouraged for Project-Related Corporate Loans that have reached Financial Close.

Project-Related Corporate Loans

Total number that reached Financial Close in the reporting period: 1

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure
Oil & Gas
Power 1
Others
Region
Americas
Europe, Middle East & Africa
Asia Pacific 1
Country Designation
Designated Country 4 1
Non Designated Country
Both
Independent Review
Yes 1
No
Totals 1
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans

Total number that reached Financial Close in the reporting period: 0

Project Name Reporting For Project-related Corporate Loans (And Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans)

No. Project Name Sector Project Location(s) Year of Financial Close
1 Shimane Nuclear Power Station Unit 3 Power Japan 2026

Implementation of the Equator Principles

SMTB’s EP implementation reporting is provided at:

https://www.smtg.jp/english/sustainability/initiatives/equator

SMTB carried out an Independent Review of Equator Principles Implementation. As part of SMTB’s independent review, as described in the Independent Practitioner’s Limited Assurance Report, SMTB’s representative sample of EP transactions were reviewed by an independent party, PricewaterhouseCoopers Japan LLC through procedures including inquiries, performing walkthroughs and evaluating the design of the main processes and controls for categorizing, collecting and reporting related to the EP transactions, inspection of documents, analytical procedures, and sample-based testing. The sample EP transactions were closed between April 1, 2025 and March 31, 2026.

Based on the procedures performed and the evidence obtained, nothing came to the reviewer’s attention that indicated material issues with the preparation of the Number of Transactions in accordance with SMTB’s adopted criteria. At the same time, through discussions with the independent reviewer, we did not identify any material areas for enhancement of the EP implementation process.

Next Independent Review of EP Implementation is expected to be conducted within the next three years.

Equator Principles
Cookie Settings

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.