National Australia Bank Limited (1 Oct 2018 – 30 Sept 2019)

Signing Date 25 Oct 2007
Region of Headquarters: Asia-Oceania
Current EPFI Reporting Year/Period: 1 Oct 2018 - 30 Sept 2019
Institutional Reporting: Link to Report - Link to Additional Report

 

Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the EP website.

Further information on this EPFI may be obtained through the Institutional Reporting hyperlink.

Project Finance Advisory Services

Total number mandated in the reporting period: 0

Project Finance Transactions

Total number that reached Financial Close in the reporting period: 14

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure 3 2
Oil & Gas 1
Power 8
Others
Region
Americas 1 4
Europe, Middle East & Africa 1
Asia Pacific 6 2
Country Designation
Designated Country 4 1 11 2
Non Designated Country
Both
Independent Review
Yes 1 11 2
No
Totals 1 11 2
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project Finance

This information is required under EP4. EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Project Name Reporting For Project Finance (And Project-related Refinance & Project-related Acquisition Finance For Project Finance)

No. Project Name Sector Project Location(s) Year of Financial Close
1 Sunraysia Solar Finance Power Australia 2018
2 Westconnex M4 Toll Road Infrastructure Australia 2018
3 Dundonnell Wind Farm Power Australia 2018
4 Moray East Offshore Wind Farm Power United Kingdom 2018
5 Westconnex M4-M5 Link Infrastructure Australia 2018
6 Junction Road Power Plant Power New Zealand 2018
7 Warradarge Wind Farm Power Australia 2018
8 Palmetto Solar Farm Power United States 2018
9 Midship Pipeline Infrastructure United States 2019
10 Prospero Solar Power United States 2019
11 Curtin University Exchange Precinct Infrastructure Australia 2019
12 ANU Student Accommodation Infrastructure Australia 2019
13 Sabine Pass LNG Terminal Oil & Gas United States 2019
14 Jackson Generation Energy Center Power United States 2019

Note, Project name reporting for Project Finance transactions (Oct 2018 – Sep 2019)

Project-Related Corporate Loans

Total number that reached Financial Close in the reporting period: 0

Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans

This information is required under EP4. EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Implementation of the Equator Principles

NAB’s EPs reporting can be found here or a direct link to the pdf is here.

EPs related information can also be found in NAB’s 2019 Sustainability Report (pages 21-23) and NAB’s 2019 Sustainablity Data Pack (Excel tab ‘Financing’). These reports can be found here