HSBC Holdings plc (2024)

Signing Date 04 Sep 2003
Region of Headquarters: Europe
Current EPFI Reporting Year/Period: 2024
Institutional Reporting: Link to Report

 

Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the EP website.

Further information on this EPFI may be obtained through the Institutional Reporting hyperlink.

Project Finance Advisory Services

Total number mandated in the reporting period: 0

Project Finance Transactions

Total number that reached Financial Close in the reporting period: 27

Equator Principles Category A1 B2 C3
Sector
Mining 2
Infrastructure 2 3 1
Oil & Gas 1
Power 2 14
Others 2
Region
Americas 7
Europe, Middle East & Africa 4 5 1
Asia Pacific 2 8
Country Designation
Designated Country 4 3 16
Non Designated Country 3 4 1
Both
Independent Review
Yes 6 16
No 4 1
Totals 6 20 1
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project Finance

Total number that reached Financial Close in the reporting period: 0

Project Name Reporting For Project Finance (And Project-related Refinance & Project-related Acquisition Finance For Project Finance)

No. Project Name Sector Project Location(s) Year of Financial Close
1 GPG Australia Portfolio Refinancing Power Australia 2024
2 High Capacity Metro Trains project Infrastructure Australia 2024
3 Gorbea Solar Power India 2024
4 Greater Changhua 4 Offshore Wind Farm Power Taiwan, China 2024
5 Darwin LNG Oil & Gas Australia 2024
6 Neoen Australia Renewables Portfolio Refinancing Power Australia 2024
7 Wattle Power Australia 2024
8 Tilt Renewables Asian Term Loan Syndication Power Australia 2024
9 Khalifa University PPP Infrastructure United Arab Emirates 2024
10 Al Ajban Solar Plant Power United Arab Emirates 2024
11 DEWA VI Power United Arab Emirates 2024
12 Fecamp Offshore Wind Power France 2024
13 Project Thorn Power Spain, Italy, United Kingdom, Netherlands, France, Germany 2024
14 Net Zero Teesside Power Power United Kingdom 2024
15 Northern Endurance Partnership Others United Kingdom 2024
16 Project Keliber Mining Finland 2024
17 Conrad (Plutus) Power United Kingdom 2024
18 Luau, Cazombo and Lumbala Road network Infrastructure Angola 2024
19 Atrisco Power United States 2024
20 Split Rail Solar Power United States 2024
21 Great Bend Solar Power United States 2024
22 Stillhouse Power United States 2024
23 Trina PV Manufacturing Facility Others United States 2024
24 Project Swift Others United States 2024

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 3

Under EP4, project name reporting is required for Project Finance transactions that have reached Financial Close and encouraged for Project-Related Corporate Loans that have reached Financial Close.

Project-Related Corporate Loans

Total number that reached Financial Close in the reporting period: 9

Equator Principles Category A1 B2 C3
Sector
Mining 1
Infrastructure 1
Oil & Gas
Power 1
Others 3 3
Region
Americas 1 1
Europe, Middle East & Africa 4 3
Asia Pacific
Country Designation
Designated Country 4 1 3
Non Designated Country 4 1
Both
Independent Review
Yes 5 3
No 1
Totals 5 4
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans

Total number that reached Financial Close in the reporting period: 0

Project Name Reporting For Project-related Corporate Loans (And Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans)

No. Project Name Sector Project Location(s) Year of Financial Close
1 Shotton Mill Others United Kingdom 2024
2 PIF Round 4 Solar PV IPPs (PIF-4) Power Saudi Arabia 2024
3 Project Recharge Others Hungary 2024
4 Strada Infrastructure Senegal 2024
5 Project Cavaliers Others Hungary 2024
6 Project HMGMA Others United States 2024
7 Sal de Oro Phase 2 project Mining Argentina 2024

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 2

Under EP4, project name reporting is encouraged for Project-Related Corporate Loans that have reached Financial Close and required for Project Finance transactions that have reached Financial Close.

EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Implementation of the Equator Principles

HSBC´s EP Implementation Reporting is provided at: Equator Principles |Sustainability risk | HSBC Holdings plc

Equator Principles
Cookie Settings

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.