Coöperatieve Rabobank U.A. (2023)

Signing Date 04 Jun 2003
Region of Headquarters: Europe
Current EPFI Reporting Year/Period: 2023
Institutional Reporting: Link to Report

 

Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the EP website.

Further information on this EPFI may be obtained through the Institutional Reporting hyperlink.

Project Finance Advisory Services

Total number mandated in the reporting period: 0

Project Finance Transactions

Total number that reached Financial Close in the reporting period: 38

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure
Oil & Gas
Power 2 31 5
Others
Region
Americas 1 8
Europe, Middle East & Africa 1 20 5
Asia Pacific 3
Country Designation
Designated Country 4 2 28 5
Non Designated Country 3
Both
Independent Review
Yes 2 20 4
No 11 1
Totals 2 31 5
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project Finance

This information is required under EP4. EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Project Name Reporting For Project Finance (And Project-related Refinance & Project-related Acquisition Finance For Project Finance)

No. Project Name Sector Project Location(s) Year of Financial Close
1 Korpilevonmäki Wind Farm Power Finland 2023
2 Eoliennes en Mer Dieppe Le Treport Power France 2023
3 Eoliennes en Mer Iles d’Yeu et de Noirmoutier Power France 2023
4 Parc du Banc de Guérande Power India 2023
5 Adani Hybrid Energy Jaisalmer One Power India 2023
6 ReNew Surya Pratap Power India 2023
7 ReNew Surya Roshni Power Italy 2023
8 Project Titan - Alantra Solar Power Italy 2023
9 Reden Italian Solar PV Portfolio Power Netherlands 2023
10 GIGA Rhino Power Netherlands 2023
11 Raedthuys Windpark Koningspleij Power Netherlands 2023
12 Zonnepark Fledderbosch Power Netherlands 2023
13 Zonnepark Markiezaat Power Netherlands 2023
14 Zonnepark Nieuweweg Power Netherlands 2023
15 Zonnepark Oudenhoorn Power Netherlands 2023
16 Zonnepark Valgenweg Power Netherlands 2023
17 Zonneweide Haghorst Power Netherlands 2023
18 Zonnewei De Raak Power Netherlands 2023
19 ZonPV Woensdrecht Power Netherlands 2023
20 Baltic Power Power Poland 2023
21 Guadiana III Power Spain 2023
22 Nexwell IS2 Power Spain 2023
23 Project Titan - Alantra Solar Power Spain 2023
24 Vulcano Power Spain 2023
25 Lyckås Vindkraft Power Sweden 2023
26 Project Franklin (Blackhillock & Kilmarnock South) Power United Kingdom 2023
27 Verdant Power United Kingdom 2023
28 Champlain Hudson Power Express Power United States 2023
29 Diversion Wind Power United States 2023
30 Fairbanks Solar Power United States 2023
31 Liberty County Solar Power United States 2023
32 Project North Fork Power United States 2023
33 Project Silicon Power United States 2023
34 Sweetland Wind Power United States 2023
35 Zier Solar and Storage Project Power United States 2023

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 3

Under EP4, project name reporting is required for Project Finance transactions that have reached Financial Close and encouraged for Project-Related Corporate Loans that have reached Financial Close.

Project-Related Corporate Loans

Total number that reached Financial Close in the reporting period: 0

Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans

This information is required under EP4. EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Implementation of the Equator Principles

Coöperatieve Rabobank´s EP implementation report is provided on p.20 of their annual report´s addendum available at: https://media.rabobank.com/m/4887ed191fdd2934/original/Additional-Sustainability-and-Tax-Information.pdf