Bank of Nova Scotia (2024)

Signing Date 25 Sep 2006
Region of Headquarters: North America
Current EPFI Reporting Year/Period: 2024
Institutional Reporting: Link to Report

 

Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the EP website.

Further information on this EPFI may be obtained through the Institutional Reporting hyperlink.

Project Finance Advisory Services

Total number mandated in the reporting period: 0

Project Finance Transactions

Total number that reached Financial Close in the reporting period: 14

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure 2 5
Oil & Gas 1 2
Power 4
Others
Region
Americas 1 8 5
Europe, Middle East & Africa
Asia Pacific
Country Designation
Designated Country 4 1 7 5
Non Designated Country 1
Both
Independent Review
Yes 1 8 4
No 1
Totals 1 8 5
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project Finance

Total number that reached Financial Close in the reporting period: 0

Project Name Reporting For Project Finance (And Project-related Refinance & Project-related Acquisition Finance For Project Finance)

No. Project Name Sector Project Location(s) Year of Financial Close
1 Project Cuxtal II, Natural Gas Pipeline Oil & Gas Mexico 2024
2 Project Aconcagua, Desalinated Water Supply Infrastructure Chile 2024
3 Project Quillagua, Photovoltaic with Battery Energy Storage System Power Chile 2024
4 Project Trillium Queensway Health Centre Infrastructure Canada 2024
5 Project Bauxite, Datacenter Construction Infrastructure United States 2024
6 Project Cedar LNG Export Facility Oil & Gas Canada 2024
7 Project Cedar Link Pipeline Oil & Gas Canada 2024
8 Project Wagon Wheel Wind Power United States 2024
9 Project Bighorn Turnkey, Data Center Construction Infrastructure United States 2024
10 Project Ranger, Data Center Construction Infrastructure United States 2024
11 Project Daybreak, Data Center Construction Infrastructure United States 2024
12 Project Victor Jara, Photovoltaic with Battery Energy Storage System Power Chile 2024
13 Project Vistra Zero (Solar with Battery Energy Storage System) Power United States 2024

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 1

Under EP4, project name reporting is required for Project Finance transactions that have reached Financial Close and encouraged for Project-Related Corporate Loans that have reached Financial Close.

Project-Related Corporate Loans

Total number that reached Financial Close in the reporting period: 1

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure 1
Oil & Gas
Power
Others
Region
Americas 1
Europe, Middle East & Africa
Asia Pacific
Country Designation
Designated Country 4
Non Designated Country 1
Both
Independent Review
Yes 1
No
Totals 1
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans

Total number that reached Financial Close in the reporting period: 0

Project Name Reporting For Project-related Corporate Loans (And Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans)

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 1

Under EP4, project name reporting is encouraged for Project-Related Corporate Loans that have reached Financial Close and required for Project Finance transactions that have reached Financial Close.

EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Implementation of the Equator Principles

Scotiabank has a robust set of internal risk management documents that direct Banking and Credit Officers to ensure compliance with the Equator Principles (EPs) for in-scope transactions. These documents describe each of the EPs requirements and provide instructions on how to comply with them. They also outline Scotiabank’s internal review, approval and escalation procedures for these transactions. The Bank’s credit unit and senior management provide oversight and approval of EP transactions. Three dedicated environmental and social risk managers are also available to provide technical advice and counsel, and training on all aspects of the EPs, when necessary. This team is also responsible for the Bank’s annual EPs reporting.

Scotiabank has also developed an internal mandatory training course on environmental and climate change risk management, which includes a section on the EPs. The Banking and Credit Officers that are involved with project-related transactions are required to take this course annually.

For more information, refer to Scotiabank’s annual Equator Principles Implementation Report on its ESG Publications & Policies webpage at: https://www.scotiabank.com/ca/en/about/responsibility-impact/esg-publications-policies.html

Equator Principles
Cookie Settings

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.