Royal Bank of Canada (2025)

Signing Date 21 Jul 2003
Region of Headquarters: North America
Current EPFI Reporting Year/Period: 2025
Institutional Reporting: Link to Report

 

Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the EP website.

Further information on this EPFI may be obtained through the Institutional Reporting hyperlink.

Project Finance Advisory Services

Total number mandated in the reporting period: 0

Project Finance Transactions

Total number that reached Financial Close in the reporting period: 42

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure 1 2
Oil & Gas 4
Power 29
Others 1 5
Region
Americas 4 31 7
Europe, Middle East & Africa
Asia Pacific
Country Designation
Designated Country 4 4 31 7
Non Designated Country
Both
Independent Review
Yes 4 31 6
No 1
Totals 4 31 7
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project Finance

Total number that reached Financial Close in the reporting period: 0

Project Name Reporting For Project Finance (And Project-related Refinance & Project-related Acquisition Finance For Project Finance)

No. Project Name Sector Project Location(s) Year of Financial Close
1 High Plains Carbon Financing Others United States 2025
2 Rio Grande LNG Train 4 Oil & Gas United States 2025
3 Rio Grande LNG Train 5 Oil & Gas United States 2025
4 Stonepeak Wallaby Oil & Gas United States 2025
5 Venture Global Calcasieu Pass 2 FID Financing Oil & Gas United States 2025
6 Sonata South Others United States 2025
7 Sonata West Others United States 2025
8 Big Creek Solar Power United States 2025
9 Stack - Project Miner Others United States 2025
10 Show Me State Solar, LLC Power United States 2025
11 Alectra Convergent JV Power Canada 2025
12 Elora BESS Power Canada 2025
13 Cordelio BrightNight -Greenwater Power United States 2025
14 Cordelio BrightNight - Pioneer Power United States 2025
15 Hedley BESS Power Canada 2025
16 Mersey River Wind Power Canada 2025
17 Vantage OH1 Others United States 2025
18 Advance Tunnel for the Yonge North Subway Extension Infrastructure Canada 2025
19 Turning Sun Solar Project Power Canada 2025
20 Wedgeport Wind Project Power Canada 2025
21 Buffalo Rail Transloading Facility Infrastructure Canada 2025
22 Trillium Health Partners M-Site Redevelopment Project Infrastructure Canada 2025
23 MECP1 Reno 1, LLC Others United States 2025
24 Dolet Hills Power United States 2025
25 EdSan 1C Power United States 2025
26 EdSan 2 Power United States 2025
27 Blackford Wind Power United States 2025
28 TwelveMile Solar 1-2 Power United States 2025
29 Blackford Solar Power United States 2025
30 Mayes Solar Power United States 2025
31 Project Easley Power United States 2025

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 11

Under EP4, project name reporting is required for Project Finance transactions that have reached Financial Close and encouraged for Project-Related Corporate Loans that have reached Financial Close.

Project-Related Corporate Loans

Total number that reached Financial Close in the reporting period: 2

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure 1
Oil & Gas
Power 1
Others
Region
Americas
Europe, Middle East & Africa 2
Asia Pacific
Country Designation
Designated Country 4 2
Non Designated Country
Both
Independent Review
Yes 2
No
Totals 2
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans

Total number that reached Financial Close in the reporting period: 0

Project Name Reporting For Project-related Corporate Loans (And Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans)

No. Project Name Sector Project Location(s) Year of Financial Close
1 Oranje Wind Power Netherlands 2025

Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 1

Under EP4, project name reporting is encouraged for Project-Related Corporate Loans that have reached Financial Close and required for Project Finance transactions that have reached Financial Close.

EP4 applies for those transactions mandated after 1 October 2020 and that have reached Financial Close by the end of the period being reported.

Implementation of the Equator Principles

RBC´s EP implementation reporting is provided in their Sustainability Report available at: Sustainability Report 2025