Taishin International Bank (2025)

Signing Date 11 Nov 2019
Region of Headquarters: Asia-Oceania
Current EPFI Reporting Year/Period: 2025
Institutional Reporting: Link to Report

 

Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the EP website.

Further information on this EPFI may be obtained through the Institutional Reporting hyperlink.

Project Finance Advisory Services

Total number mandated in the reporting period: 0

Project Finance Transactions

Total number that reached Financial Close in the reporting period: 10

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure 1
Oil & Gas
Power 2 5
Others 2
Region
Americas
Europe, Middle East & Africa
Asia Pacific 2 8
Country Designation
Designated Country 4 1
Non Designated Country 2 7
Both
Independent Review
Yes 2 4
No 4
Totals 2 8
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project Finance

Total number that reached Financial Close in the reporting period: 4

Sector
Mining
Infrastructure
Oil & Gas
Power 2
Others 2
Sub-Total 4
Region
Americas
Europe, Middle East & Africa
Asia Pacific 4
Sub-Total 4
Country Designation
Designated Country 1
Non Designated Country 3
Both
Sub-Total 4

Project Name Reporting For Project Finance (And Project-related Refinance & Project-related Acquisition Finance For Project Finance)

No. Project Name Sector Project Location(s) Year of Financial Close
1 JHIH-GUANG Energy Co., Ltd. NT$5.7 billion syndicated loan Power Taiwan, China 2025
2 Fengmiao Wind Power Co., Ltd. Power Taiwan, China 2025
3 FDMC Chaozhou 99MW Energy Storage Project Power Taiwan, China 2025
4 Energy Storage System Construction Project Power Taiwan, China 2025
5 PAU CHENG ENERGY CORP. LINBIAN PROJECT Power Taiwan, China 2025
6 DA XU Energy Co., Ltd. NT$2.5 billion syndicated loan Power Taiwan, China 2025
7 Project CHW04 Power Taiwan, China 2025
8 Project River Others Japan 2025
9 Follow Holding Real Estate Development Others China 2025
10 Kaohsiung City AI-Powered Intelligent High-Efficiency Incinerator BOT Project Infrastructure Taiwan, China 2025
11 Project Mokoan Power Australia 2024
12 Project Westwood Others Taiwan, China 2025
13 DC Development Noida Limited Others India 2023
14 Project CHW02 Power Taiwan, China 2024

Project-Related Corporate Loans

Total number that reached Financial Close in the reporting period: 1

Equator Principles Category A1 B2 C3
Sector
Mining
Infrastructure
Oil & Gas
Power
Others 1
Region
Americas
Europe, Middle East & Africa
Asia Pacific 1
Country Designation
Designated Country 4
Non Designated Country 1
Both
Independent Review
Yes
No 1
Totals 1
1

Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.

2

Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.

3

Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.

4

Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.

Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans

Total number that reached Financial Close in the reporting period: 0

Project Name Reporting For Project-related Corporate Loans (And Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans)

No. Project Name Sector Project Location(s) Year of Financial Close
1 Kaohsiung Port Intercontinental Container Terminal Phase I – Submarine Cable Manufacturing Plant Project Others Taiwan, China 2025

Implementation of the Equator Principles

Taishin has formulated the ” Guidelines for Loan Applications to the Equator Principles ” and related checklists. All financing cases need to be reviewed in accordance with the Equator Principles. If the case meets the scope of the Equator Principles, it is necessary to evaluate the degree of impact of the case on the environment and society. According to the risk and impact size, it is divided into Category A, B, and C. Cases falling into Category A and B require an environmental and social risk assessment report issued by an independent third-party institution, which will then be reviewed by the Bank’s dedicated auditors and supervisors.

For case that meets the scope of the Equator Principles, the undertaker must explain the content of the Equator Principles to the client, and confirm that the client is willing to abide by the Equator Principles. The Bank will provide necessary assistance. If the customer fails to comply with the Equator Principles, the customer’s financing application will be declined.

If the post-loan monitoring conditions are listed in the environmental and social risk assessment report issued by an independent third-party institution, the customer will be required to entrust an independent third-party institution to issue monitoring reports on a regular basis. The Bank’s dedicated auditors and supervisors will confirm whether the specified monitoring conditions are met. If the customer cannot cooperate with the implementation, or fails to meet the monitoring conditions and has no intention to improve, the customer will be asked to repay the loan.

Taishin has provided online courses on Equator Principles education and training for colleagues who are unable to attend in person or whose time is limited to meet their needs.

Equator Principles
Cookie Settings

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.