Canadian Imperial Bank of Commerce (CIBC) (2024)
| Signing Date | 03 Dec 2003 |
| Region of Headquarters: | North America |
| Current EPFI Reporting Year/Period: | 2024 |
| Institutional Reporting: | Link to Report |
Please read the important notes and disclaimer for further information on ‘EPFI Reporting’, compliance and publication on the EP website.
Further information on this EPFI may be obtained through the Institutional Reporting hyperlink.
Project Finance Advisory Services
Total number mandated in the reporting period: 0
Project Finance Transactions
Total number that reached Financial Close in the reporting period: 32
| Equator Principles Category | A1 | B2 | C3 |
|---|---|---|---|
| Sector | |||
| Mining | |||
| Infrastructure | 1 | 1 | 4 |
| Oil & Gas | 1 | 2 | |
| Power | 2 | 21 | |
| Others | |||
| Region | |||
| Americas | 2 | 21 | 4 |
| Europe, Middle East & Africa | 2 | 2 | |
| Asia Pacific | 1 | ||
| Country Designation | |||
| Designated Country 4 | 4 | 24 | 4 |
| Non Designated Country | |||
| Both | |||
| Independent Review | |||
| Yes | 4 | 24 | 4 |
| No | |||
| Totals | 4 | 24 | 4 |
Category A – Projects with potential significant adverse environmental and social risks and/or impacts that are diverse, irreversible or unprecedented.
Category B – Projects with potential limited adverse environmental and social risks and/or impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures.
Category C – Projects with minimal or no adverse environmental and social risks and/or impacts.
Designated Countries are those countries deemed to have robust environmental and social governance, legislation systems and institutional capacity designed to protect their people and the natural environment.
Project-related Refinance & Project-related Acquisition For Project Finance
Total number that reached Financial Close in the reporting period: 0
Project Name Reporting For Project Finance (And Project-related Refinance & Project-related Acquisition Finance For Project Finance)
| No. | Project Name | Sector | Project Location(s) | Year of Financial Close |
|---|---|---|---|---|
| 1 | Cedar LNG Partners LP | Oil & Gas | Canada | 2024 |
| 2 | Coastal Virginia Offshore Wind | Power | United States | 2024 |
| 3 | Net Zero North Sea Storage Limited | Infrastructure | United Kingdom | 2024 |
| 4 | Net Zero Teesside Power Limited | Power | United Kingdom | 2024 |
| 5 | Buffalo Plains Wind Farm | Power | Canada | 2024 |
| 6 | Eland 2 Solar + Storage" | Power | United States | 2024 |
| 7 | Serrano | Power | United States | 2024 |
| 8 | Wagon Wheel | Power | United States | 2024 |
| 9 | Posey Solar | Power | United States | 2024 |
| 10 | Box Canyon | Power | United States | 2024 |
| 11 | High Coast | Power | Sweden | 2024 |
| 12 | Gate Terminal T4 | Oil & Gas | Netherlands | 2024 |
| 13 | Cedar Links Project | Oil & Gas | Canada | 2024 |
| 14 | Orana BESS | Power | Australia | 2024 |
| 15 | BESS del Desierto | Power | Chile | 2024 |
| 16 | Green River Energy Centre | Power | United States | 2024 |
| 17 | e-VAC Magnetics LLC | Infrastructure | United States | 2024 |
| 18 | Prosperity Wind | Power | United States | 2024 |
| 19 | Centennial Flats | Power | United States | 2024 |
| 20 | Sun Pond | Power | United States | 2024 |
| 21 | Pleasant Valley Solar 2 | Power | United States | 2024 |
| 22 | Bellefield 2 | Power | United States | 2024 |
| 23 | Redfield Solar | Power | United States | 2024 |
| 24 | Tilbury BESS | Power | Canada | 2024 |
| 25 | Cadence Solar Energy | Power | United States | 2024 |
| 26 | Yum Yum Solar | Power | United States | 2024 |
| 27 | Trade Post Solar | Power | United States | 2024 |
| 28 | Fibre Connect | Infrastructure | Canada | 2024 |
| 29 | Project Bighorn | Infrastructure | United States | 2024 |
Number of projects that were not disclosed as per the disclosure conditions specified in Annex B of the Principles: 3
Under EP4, project name reporting is required for Project Finance transactions that have reached Financial Close and encouraged for Project-Related Corporate Loans that have reached Financial Close.
Project-Related Corporate Loans
Total number that reached Financial Close in the reporting period: 0
Project-related Refinance & Project-related Acquisition For Project-related Corporate Loans
Total number that reached Financial Close in the reporting period: 0
Implementation of the Equator Principles
CIBC’s implementation reporting can be found here: Environmental and Social Risk